10.06.2011

Koolhass

So I finally finished the Koolhass last night.



It's certainly a cute hat but it was a total pain in the ass to knit. I've decided I am not a fan of constant cable crosses at all so this will probably be the only time I knit this hat. It will probably get set aside to my christmas stock pile in case I need a present.

In other Christmas knitting related news, I will be making Mom an Autumn Leaves Stole and my MIL has requested another pair of Thrummed mittens for one of her co-workers to give as a gift. Slowly but surely I will make sure everyone in the South Shore area of MA will have thrummed mittens!

Manda has requested a teal honeycowl for her birthday so once that yarn comes in that will be my next project. In the meantime I'm finally working on the Noro Striped Scarf with Knit Picks Chroma. The Chroma is so soft and will make for a very cozy scarf. This will be my inbetween project to work on when I'm waiting on yarn like I am now. I still need to decide what I will knit for Laura for Christmas and I would like to work in a pair of socks for my niece Kaitlyn since Jessica hijacked the pair I was going to give to her. They might have to be ankle socks though, we'll see how long Autumn leaves takes.

10.03.2011

Wedding Shawl

Here are a few pictures from my wedding of my wearing my Hanami. There's also a shot of Manda wearing her Something Lacey. It had to be pinned in the back to make it stay put. I'm glad I made it. It wound up being quite chilly on our wedding day and it was absolutely freezing during pictures! It was so nice to wear and I got loads of compliments on it so it made all those hours of knitting lace well worth it. :)

10.01.2011

Cables without Needles

Assignment number 1. Learn to knit Koolhaas without the cable needle = Success. It still isn't fun, but it's much less annoying.

New Yarn from the honeymoon

My sock from the airplane has suffered a terrible fate. I tried picking up the stitches again but I'm awful at that when yarn overs and decreases are involved with a lace pattern. That combined with I wasn't taking great notes so I couldn't remembered where I was in the pattern I ripped it out to the toe. That sucked but it was just a project I was knitting just because. It wasn't meant for anybody so that made it suck less. I can go back to it later.

The sock wasn't the only project I had with me so I still had some airplane knitting. I've got a Koolhass going right now. It's kind of an annoying knit with the constant cable crosses. Today I'm giving myself the assignment of figuring out how to cable without a cable needle. Hopefully that will make it less annoying to knit.

My only knitting related souvenir I picked up was this yarn in Bruges.




It is Cashwool 150, 100% wool. Each ball is 50grams or about 150 meters. (164 yards) The yellow is a mustard yellow and the darker ball is a real dark burgundy/almost brown. I'm thinking together I could make a really cute color work hat or pair of mittens. Maybe something similar to this. I would say it might be a christmas gift but since it's the only yarn from my honeymoon I think whatever I make I will keep for myself.

Along with my learn to cable without cable needles assignment today I also need to start considering Christmas knitting. This year will definitely be the year someone gets a pair of glittens.

9.29.2011

I'm back!

I'm back! Finally! I got married! I went on a honeymoon! I didn't get as much knitting done as I expected! Security made me ruin my sock by trying to steal my needles (but they gave them back)! I have a new last name! And a great appreciation for waffles! And Belgian beer!

There may be knitting related content to come in the future but for now I will be obsessing over wedding pictures and trying to decide which one will be my new facebook profile picture.

In the meantime there's a metric crapload of honeymoon pictures in case anyone is interested.


Honeymoon!


2011-09-27 Honeymoon 2011

9.13.2011

A few things

I finished up Manda's Something Lacy shrug. I actually finished it up on Labor day. I still need to weave the ends in though. I don't know why I keep putting that off.  It isn't like it's some ginormous project with a million ends to weave in but I just keep putting it off. She'll be here tomorrow so I guess I better get to it tonight. In the mean time I've been working on a pair of socks from the toe up book. That pattern is fun and interesting and it seems like a toe up sock works up quicker than top down. I still love the way Lorna's Laces feels too. So soft!

I think I'm going to take the socks and yarn for one other project with me for airplane knitting. I'm debating between the summer flies shawl and a koolhass hat. I'm thinking a hat would be easier to keep track of, but I don't want to run out of knitting and not have anything to do on the flight back. Then again, I'm not really that fast of a knitter.

In other news, I'm getting married Saturday. OMG.

9.01.2011

Something Lacy progress

I finished up the back of Something Lacy last night and blocked it out.





It looks much bigger than it is. I seamed up the sleeves tonight and have started the ribbing around the body. I had to try it on after seaming the sleeves to make sure it fit. At first I seamed up the sleeves too much and couldn't squeeze into it. I took out a few inches on each sleeve and tried it on again and it fit. They're almost elbow length and cover the worst portion of my arms so I think that's probably mission accomplished. Hopefully I'll find the time this weekend to finish up the body ribbing and get the sleeve ribbing started by Monday. That won't take but a minute since the sleeves are already plenty long enough.

You better like this Manda, it's the only one you're getting! :)